Some adjustments to brackets may be required to fit the larger pole.ĥ. Submit the Boom gate drawing for review/approvalģ.ĝraw up a trackside disconnection Box (Mushroom type box, details to be supplied)Ĥ.Ědd additional Warning lights and signage, these items are already drawn up (and attached to a 100nb pole) and can be copied from an existing drawing/assembly. We need to add boom gates to drawings and a 3D site view of the level crossing.ġ.ĝraw Up boom Gate assembly in 3D and attach to 125nb gal pole following the drawings that we supply.Ģ. We have existing drawings to follow as a guide and a complete set of Autodesk drawings of level crossing components. Contractor shall require some mechanical knowledge/design on assembly of post equipment, designing brackets etc.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |